ÇòÃË»á¹ÙÍø

½Ó´ýÀ´µ½ÇòÃË»á¹ÙÍø,ÆÚ´ýÓëÄúµÄÏàÖú£¡

¹ØÓÚÇòÃË»á¹ÙÍø|ÁªÏµÇòÃË»á¹ÙÍø|Êղر¾Õ¾

ÇòÃË»á¹ÙÍø

¼ÒÓõçÌÝЧÀÍÉÌ-ÇòÃË»á¹ÙÍøһվʽҺѹÉý½µ»õÌÝ¡¢µÇ³µÇÅÉú²úЧÀͳ§¼Ò

È«¹úЧÀÍÈÈÏß159-6669-1503

¼ÃÄÏÇòÃË»á¹ÙÍøÉý½µ»úеÉ豸ÓÐÏÞ¹«Ë¾

Éý½µÆ½Ì¨³§¼Ò¸æËßÄãÔõÑù×ö·ÀÀײ½·¥ £¿

À´Ô´£ºÇòÃË»á¹ÙÍø Ðû²¼ÈÕÆÚ£º2022-05-16 08:49:54

1.×°ÖýӵØϵͳ¡£Éý½µÆ½Ì¨³§¼ÒÌáÐÑ£¬ÒºÑ¹Éý½µÆ½Ì¨Í¨³£¼ä¸ô5Ã×½ÓÄÉ3¸ù2¡¢5Ã׳¤¸Ö¹Ü»ò½Ç¸Ö»®·Ö±ÊÖ±´òÈëµØÏÂ0¡¢5Ã×ÉîdzµÄÂñ²Ø£¬À´ÊµÏÖÈ˹¤½ÓµØÌ壬ͬʱ£¬Óñâ¸Öº¸½ÓÁ¬½ÓÉϲ¿£¬Òý³öÓëÒýÏÂÏßÁ¬½Ó£¬×é³ÉÒ»×é¶ÔÓ¦µÄ½ÓµØÌå¡£Grounding system. The lifting platform to remind manufacturers, hydraulic lifting platform is usually a distance of 5 meters by 3 2, 5 meters long steel pipe or steel are vertically driven underground 0, 5 meters depth of burial, to achieve artificial grounding, at the same time, with the flat welding connection leads connected with the upper lead line, composed of a group of the ground body.

2.×°Öö¥¶ËʹÓÃÉÁ½ÓÆ÷¡£Éý½µÆ½Ì¨³§¼ÒÌáÐÑ£¬ÒºÑ¹Éý½µÆ½Ì¨·ÀÀ×± £»¤É豸µÄ¶¥¶ËÖ÷Òª°²¶Ù³¤Îª1¡ª2Ã××óÓÒÕ볤µÄ±ÜÀ×Õ룬±ÜÀ×ÕëÔÚÖÆ×÷ʱ£¬Ò»°ãʹÓøֹÜ£¬´ò±âÕë¹Ü¶¥¶Ë£¬¿Éͨ¹ýº¸½Ó½øÐкÏÀíµÄ·â¿Ú»òÖƳɼâ×´£¬Íê³É±ÜÀ×ÕëÖÆ×÷Ö®ºó£¬¿É½øÐÐÊʶȵÄÈȶÈп¡£Í¬Ê±£¬ÔËÓú¸½Ó»òÂÝ˨ÏàÁ¬½Ó±ÜÀ×ÕëºÍÒýÏÂÏß¡£Install top using flash. The lifting platform to remind manufacturers, top of the hydraulic lifting platform mainly for lightning protection equipment for 1 - 2 meters long needle lightning, a lightning rod in the production, the general use of steel pipe, flat tube top, can be reasonably made by welding or sealing tip, after the lightning rod can be made moderate heat zinc. At the same time, the use of welding or bolts to connect the lightning rod and lead off the assembly line.

3.×°ÖÃÒýÏß·ÀÀ×ϵͳ¡£Éý½µÆ½Ì¨³§¼ÒÌáÐÑ£¬·À¸¯º¸½Óʱ£¬ÐèÔÚº¸·ì´¦½øÐвÙ×÷£¬Ê¹ÓÃÁ½Ö»²»Ð¡ÓÚ¶ÆпÂÝ˨ʩ¼ÓÒ»¶¨µÄËÉ¿ªµæȦ¼Ó¹ÌÀ´ÊµÏÖÂÝ˨µÄÁ¬½Ó¡£Éý½µÆ½Ì¨³§¼ÒÌرðÌáʾ£¬Á¬½ÓÒýÏÂÏߣ¬¿Éͨ¹ýʹÓöà¹Éͭоµ¼ÏßÁ¬½Ó»òÓõ¼Ïß¿ç½Ó¸Ö½á¹¹ÌåÁ¬½Ó´¦ºÏÀí½áºÏÀ´ÊµÏֵģ¬²¢ÓÉרҵ½ÓµØÌåÈËÔ±À´Íê³É½ÓµØ×°Öá£Installation lead lightning protection system. Lifting platform manufacturers to remind, anti-corrosion welding, the need to operate at the weld, the use of two not less than galvanized bolts to apply a certain relaxation of the gasket to achieve the connection. The lifting platform manufacturers of special tips, connecting the lead line, by the use of multi strand copper core wires or with a wire jumper steel structure connection reasonable combination to achieve, and by professional personnel to complete the grounding grounding device.


×ÉѯÈÈÏß

0531-84241658
ÍøÕ¾µØͼ
ÓÑÇéÁ´½Ó£º9Óλá¹ÙÍø  ±ØÒ»ÌåÓý  bat365¹ÙÍø  ÀûÀ´¼¯ÍÅ  ÈËÉú¾ÍÊDz«  yyÒ×ÓΠ ºÍ¼Çag  ÇòËÙÌåÓý  BsportsÌåÓý  ¿­·¢k8¹ú¼Ê  pgµç×Ó¹ÙÍø  Ôƶ¥¼¯ÍÅ  Ôƶ¥¼¯ÍŹÙÍø  ½ñÄê»á  yyÒ×ÓÎ